Categorical Exclusion (CX) Determinations

Fermi Site Office CX Determinations

Categorical Exclusion Determination Documents (CX Determinations): *

Determination Date Name of Action: Description Categorical Exclusion NumberExternal link
01/17/2013 Hydrostatic Relief Action at the Neutrinos at the Main Injector (NuMI).pdf file (607KB) B2.5
12/20/2012 Project to "Establish a Muon Gyromagnetic Ratio Measurement (g-2) Experiment within the Muon Campus".pdf file (1.9MB) B1.30; B1.31; B3.10
11/15/2012 Cultural Resources Testing and Preservation Project.pdf file (601KB) B3.1; B3.3
09/10/2012 Sitewide Domestic Water Service Replacement Project.pdf file (593KB) B1.3; B1.15
06/12/2012 Fermilab Muon Campus, including Muon to Electron Conversion (Mu2e) Experiment and the MC-1 Building..pdf file (2.3MB) B1.15; B3.10
04/12/2012 A 35 Ton Liquid Argon Prototype Detector will be built in building PC-4 as a prototype detector for the Long Baseline Neutrino Experiment.pdf file (546KB) B3.6
10/03/2011 Borings will be drilled adjacent to the NuMI Target Hall to a depth of 110 to 155 feet into bedrock to assess groundwater gradients in order to reduce groundwater levels about 10 feet..pdf file (1.0MB) B3.1
09/14/2011 Demolition and removal of Site 12 Barn.pdf file (628KB) B1.23
09/12/2011 IB-1 Mezzanine Renovation Project will replace the heating, ventilation, and air conditioning system, repair the floor struction, and increase the number of offices from 6 to 8..pdf file (827KB) B1.15
07/22/2011 Demolition of Tagged Photon Lab Trailer T035.pdf file (675KB) B1.23
Last modified: 12/20/2013 3:47:48 PM