Categorical Exclusion (CX) Determinations

Fermi Site Office CX Determinations

Categorical Exclusion Determination Documents (CX Determinations): *

Determination Date Name of Action: Description Categorical Exclusion NumberExternal link
05/20/2011 Demolition and removal of Trailers T116, T124 and T134.pdf file (662KB) B1.23
03/08/2011 Industrial Area Site Upgrades will include changes to enlarge a new parking lot to be constructed between the Central Helium Liquefier facility and Industrial Building 1..pdf file (1.7MB) B1.15
03/08/2011 MicroBooNE project will extract physics discoveries from the first ever large Liquid Argon Time Projection Chamber (LArTPC) detector that will be exposed to a neutrino beam. The 175-ton LArTPC detector for the MicroBooNE project will be located in a below grade cylinder structure similar to the MiniBooNE detector enclosure along the Booster Neutrino Beam line, just upstream of the MiniBooNE detector enclosure..pdf file (3.4MB) B3.10; B1.15
07/21/2010 NEA/NEB/NS8 Deactivation and Decommissioning at the fixed target beamline will include the removal and storage of 770 cubic yards of rock from the roofs of NEB and NEA, the removal and reuse of 32 shielding blocks at other Accelerator Division sites, the removal and recycling of concrete cinder blocks, and the removal and reuse or storage of metals..pdf file (766KB) B1.23
07/13/2010 D-Zero Experiment Emergency Generator Fuel Tank will include replacing the existing single-walled fuel tank with a new 390 gallon double-walled fuel tank that meets the secondary containment requirements of the Spill Prevention, Control and Countermeasure regulations..pdf file (1.0MB) B1.3
07/09/2010 A1 to CDF Paving Project will include paving Road D from the A1 Road intersection to the Collider Detector Facility. The roadside drainage will be regraded and new storm sewers and swales installed. The project will include the reconfiguration of the A1 Road/Road D intersection to include bike trails..pdf file (2.5MB) B1.3
07/01/2010 The Illinois Accelerator Research Center (IARC) will be a 40,000 square foot building and paved areas constructed adjacent to and north and west of the existing Fermilab Collider Detector Facility Building..pdf file (1.2MB) B1.15
06/23/2010 Industrial Area Site Upgrade will replace utilities currently under the Collider Detector Facility parking lot in a new alignment adjacent to Road D and construct a new parking lot between the Central Helium Liquefier facility and Industrial Building 1..pdf file (1.3MB) B1.15
05/27/2010 MINERvA Test Beam Detector Calibration Experiment will install a smaller version of the full scale MINERvA detector and expose it to a test beam. The experiment will calibrate the detector scintillator response to protons, pions, and electrons: measure detector resolution; and estimate the bias on the calorimetric energy reconstruction for the protons, pions, and electrons..pdf file (1.0MB) B3.6
05/19/2010 Drell-Yan SeaQuest Project will build & operate a new spectrometer (detector) in the New Muon 4 (NM4) Hall to measure quart & antiquark structure of the nucleon. The experiment will utilize unused NM4 space & existing shielding, magnetics, & gas chambers..pdf file (997KB) B3.6
Last modified: 12/20/2013 3:47:48 PM