SC Projects

Review Dates (updated March 2015)

Project Location Date
Lux-Zeplin (LZ) Project LBNL 3/11-13/2015
12 GeV CEBAF Upgrade TJNAF 3/12/2015
Research Support Building (RSB) and Infrastructure Modernization SLAC 3/17-18/2015
Facility for Rare Isotope Beams (FRIB) MSU 3/31-4/2/2015
Linac Coherent Light Source II (LCLS-II) SLAC 4/7-9/2015
Infrastructure and Operational Improvmeents (IOI) PPPL 4/14-15/2015
U.S. Contributions to the ITER Project ORNL 4/28-29/2015
National Spherical Torus Experiment (NSTX) Upgrade PPPL 5/5/2015
TENTATIVE: Photon Science Laboratory Building (PSLB) SLAC 5/5-6/2015
TENTATIVE: Science and User Support Building (SUSB) SLAC 5/7/2015
Muon g-2 FNAL 6/25-26/2015
Long Baseline Neutrino Facility (LBNF) FNAL 7/6-10/2015
TENTATIVE: Dark Energy Spectroscopic Instrument (DESI) LBNL 7/2015
TENTATIVE: SuperCDMS-SNOLAB SLAC 7/2015
Large Synoptic Survey Telescope Camera (LSSTCam) SLAC 8/4-6/2015
Long Baseline Neutrino Facility (LBNF) FNAL 11/2015
Materials Design Laboratory (MDL) ANL 11/2015
Last modified: 3/17/2015 3:04:27 PM