Categorical Exclusion (CX) Determinations

Fermi Site Office CX Determinations

Categorical Exclusion Determination Documents (CX Determinations): *

Determination Date Name of Action: Description Categorical Exclusion NumberExternal link
09/10/2012 Sitewide Domestic Water Service Replacement Project.pdf file (593KB) B1.3; B1.15
06/12/2012 Fermilab Muon Campus, including Muon to Electron Conversion (Mu2e) Experiment and the MC-1 Building..pdf file (2.3MB) B1.15; B3.10
04/12/2012 A 35 Ton Liquid Argon Prototype Detector will be built in building PC-4 as a prototype detector for the Long Baseline Neutrino Experiment.pdf file (546KB) B3.6
10/03/2011 Borings will be drilled adjacent to the NuMI Target Hall to a depth of 110 to 155 feet into bedrock to assess groundwater gradients in order to reduce groundwater levels about 10 feet..pdf file (1.0MB) B3.1
09/14/2011 Demolition and removal of Site 12 Barn.pdf file (628KB) B1.23
09/12/2011 IB-1 Mezzanine Renovation Project will replace the heating, ventilation, and air conditioning system, repair the floor struction, and increase the number of offices from 6 to 8..pdf file (827KB) B1.15
07/22/2011 Demolition of Tagged Photon Lab Trailer T035.pdf file (675KB) B1.23
06/27/2011 Phase and Frequency Locked Magnetrons for Superconducting Radio Frequency Phase II project will custom-build an L-band magnetron for testing with a complete radiofrequency system..pdf file (778KB) B3.6
05/20/2011 Demolition and removal of Trailers T116, T124 and T134.pdf file (662KB) B1.23
03/08/2011 Industrial Area Site Upgrades will include changes to enlarge a new parking lot to be constructed between the Central Helium Liquefier facility and Industrial Building 1..pdf file (1.7MB) B1.15
Last modified: 11/13/2013 7:30:27 AM